Log Book

Log One

4/15/17

Both of us worked on finalizing the initial prototype design.


Log Two

4/22/17

Emil printed out a test model of the frame


Log Three

4/23/17

We decided to develop legs to keep the frame upright


Log Four

4/28/17

Selected parts and ordered motors, control board, battery, and R/C controller


Log Five

4/29/17

Printed out the legs for the model mention before


Log Six

5/6/17

Parts arrived and began assembling first prototype


Log Seven

5/7/17

Motors ended up breaking, so we’ll have to reorder some replacements.


Log Eight

5/13/17

Frame was printed too small as the plastic shrinks when it cools, so we have to reprint it slightly larger to compensate./p>


Log Nine

5/20/17

Cleaned frame by removing excess support plastic and began reassembling prototype with the new parts


Log Ten

5/27/17

We ended up losing some of the screws and nuts we ordered, so we’ll need to reorder those parts and work through the kinks of the current design